Conc Gutter Ty A Valley Gutter

Usually curb and gutter are constructed together at a site.
Conc gutter ty a valley gutter. Install an 18 tie bar across the joint. Conc gutter ty b valley gutter notes. P projects 3667 2013 standard specifications detail plates str 6 dwg concrete valley gutter flowline flowline flowline 6 typical type 1 curb gutter typical 25 radius typical 6 conc. Quantity avg bid quantity avg bid.
Install a 1 2 premolded full depth isolation joint the same shape abut existing curb and gutter taper the last two 2 feet of the curb from 6 8. Quantity avg bid quantity avg bid. Form saw or score 1 as the curb and gutter just ahead of the taper. Item no description units march 31 2019 twelve month moving usage.
Cast or rubbed concrete curb on high. Conc curb gutter ty ii a lf. Of valley gutter spouting 250 mm minimum overall valley gutter width 20 mm cut out to fascia valley rafter continuous solid support for valley gutter metal valley gutter half of gutter shown dotted 80 mm minimum roof overhangs valley rafter rafter continuous solid support for valley gutter 50 mm minimum e2 as1 but 100 mm recommended purlin. It is abutted with a gutter which is a flat concrete slab that drains out water away from the yard.
Depth of sawcut depth of sawcut depth of sawcut type e type f shoulder gutter type a type b type d contraction joint in curb contraction joint in curb and gutter depth of sawcut depth of sawcut depth of sawcut sawcuts should be avoided within valley gutter and within curb and gutter endings. Conc curb ty b mountable. Curb is a short wall installed to hold the pavement from the sides and act as a barrier between yard and street. Conc gutter ty a valley gutter notes.
2 do not place backfill or pavement adjacent to the curb curb and gutter gutter shoulder 3 berm gutter expressway gutter or concrete valley gutter until at least 3 curing days as 4 defined in article 825 9 have elapsed. Conc curb mono ty i mod lf. Item no description units march 31 2019 twelve month moving usage. Conc curb ty d barrier.
Conc curb mono ty ii a lf. In height to 0. 5 complete backfill within 4 calendar days after the completion of the 3 day curing period 6 unless otherwise approved. Conc valley gutter ty a 6 ft notes.
Curb and gutter endings adjacent to flexible pavement curb and gutter and type a curb contraction joint in curb concrete bumper guard asphaltic concrete curb contraction joint in curb and gutter and concrete pavement expansion joint between gutter sawcuts should be avoided within valley gutter and within curb and gutter endings. Conc curb gutter ty ii mod lf.